|
Tuesday, 13 May 2008 02:26 |
| |
We are getting down to the wire. Spring is flying by, and summer is knocking at the door. I can tell by the appearance of Brenda's tulips up at the lake that my time for working inside on projects is just about over until Autumn. So I really need to get things in gear and finish up the bathroom.
This weekend we made some decent progress. We installed the rest of the tile backer board, and sheetrock, and started tiling the tub surround. We are about half way done with the tile, so next weekend hopefully we can get the rest of it up, and be ready to grout.
|
|
|
|